Lay it 25 degrees cooler.
Clinoptilolite carries 10–15% of its weight as water locked inside the crystal. Above 100 °C that water releases as steam, foams the binder and drops its viscosity.
Add it to the mix as the bitumen goes in and you can produce, transport and compact at markedly lower temperature. Less fuel at the plant. Fewer fumes at the paver. A longer haul window and a longer laying season.
The technique is established rather than experimental: evaluated independently by the National Center for Asphalt Technology, documented across European practice by the Federal Highway Administration, and tested on natural zeolite through all asphalt layers by the Technical University of Košice.
The same mineral has a second, better-evidenced construction use as a pozzolanic addition in concrete and in autoclaved aerated concrete.
And as winter grit, 1–3 mm angular clinoptilolite gives traction near watercourses, salt-sensitive planting and bridge structures without adding chloride to the runoff.
Watch the two-minute film
What has actually been measured
- 10–15% of its weight is water locked in the crystal — the reservoir the whole process depends onloss on ignition 6.4–15.8%
- Lay temperature reduced by about 25 °C at ~0.3% of mix massestablished warm-mix practice
- Tested on natural zeolite through all asphalt layersTechnical University of Košice
- Independently evaluatedNational Center for Asphalt Technology; FHWA
How to use it
- Warm-mix asphalt: approximately 0.3% of total mix mass, added with the bitumen. We supply trial quantities and work with your laboratory on the mix design.
- Delivery: bulk silo or 1 t big bags — asphalt plants and concrete producers take bulk, not sacks.
- Concrete: <50 µm as a pozzolanic addition; 0.5–1 mm for autoclaved aerated concrete.
- Winter grit: 1–3 mm angular, spread as you would spread sand.
What it will not do
Winter grit provides traction, in the same way sand and grit do. It does not melt ice. Zeolite is insoluble and cannot depress the freezing point of water, and any supplier who tells you it replaces road salt is describing something their product does not do. What it offers over sand is that it absorbs water rather than skating on a wet film, it is angular rather than rounded, and it is chloride-free.
An asphalt plant is a two-year qualification, not a purchase order. We start with trial quantities and your own mix design laboratory.
Products and pack sizes
| Product | Grade | Pack |
|---|---|---|
| ASP-WMA-BB | 0,1–1,5 mm | 1.000 kg big bag |
| ASP-WMA-BULK | 0,1–1,5 mm | 24 t bulk |
| CON-POZ-BULK | <50 µm | 24 t bulk |
| CON-AAC-BB | 0,5–1 mm | 1.000 kg big bag |
| WIN-GRIT-BB | 1–3 mm | 1.000 kg big bag |
| WIN-GRIT-25 | 1–3 mm | 25 kg sack |
Specification
- Clinoptilolite content
- 93–100% (XRD)
- Cation exchange capacity
- 108–146 meq/100 g
- Bulk density
- 650–850 kg/m³
- pH
- 7.0–8.0
- Specific surface area
- 40 m²/g
- Pore diameter
- 0.43 nm
- Hardness (Mohs)
- 2–3
- Loss on ignition
- 6.4–15.8%
- Na₂O
- 0.3–1.3%
- Quartz
- 0–2%